Reform construction passage(1)
The passage of the reform construction of the house is contributed at the frequency once a week from this week.
The exchange work in the window of each room of the first floor was done this week (The washing stand, the rest room, and the closet were excluded). The construction of the kitchen will start from next week. It becomes impossible to use the kitchen for the construction period as a matter of course. Moreover, it is necessary to save the thing (television and table, etc.) in the living room next to the kitchen in other rooms.
Meal will be taken by the second floor not constructed this time for the time being.
「住まい・インテリア」カテゴリの記事
- The reform of the house was completed(2008.03.16)
- The reform is completed by least(2008.03.01)
- Reform construction passage(5)(2008.02.23)
- Reform construction passage(4)(2008.02.10)
- Reform construction passage(3)(2008.02.03)
TrackBack
TrackBack URL for this entry:
http://app.cocolog-nifty.com/t/trackback/4007/17753337
Listed below are links to weblogs that reference Reform construction passage(1):


Comments