« The reform will start from tomorrow | Main | NACK5 STADIUM OMIYA »

January 19, 2008

Reform construction passage(1)

The passage of the reform construction of the house is contributed at the frequency once a week from this week.

The exchange work in the window of each room of the first floor was done this week (The washing stand, the rest room, and the closet were excluded). The construction of the kitchen will start from next week. It becomes impossible to use the kitchen for the construction period as a matter of course. Moreover, it is necessary to save the thing (television and table, etc.) in the living room next to the kitchen in other rooms.
Meal will be taken by the second floor not constructed this time for the time being.

|