« A cold day still continues | Main | Internet Explorer 7(IE7) »

February 03, 2008

Reform construction passage(3)

Construction that renewed the floor in the living room (Integrated it with the kitchen) and the entrance hall was done this week. It came to be able to eat in the living room today though the crossing putting of the wall had not been done yet. The illuminator was incidentally renewed, and the fire alarm was set up in kitchen.
The following schedule the bathroom (especially, changing room) to be constructed.

|

« A cold day still continues | Main | Internet Explorer 7(IE7) »

「住まい・インテリア」カテゴリの記事

Comments

Post a comment



(Not displayed with comment.)




TrackBack

TrackBack URL for this entry:
http://app.cocolog-nifty.com/t/trackback/4007/17946173

Listed below are links to weblogs that reference Reform construction passage(3):

« A cold day still continues | Main | Internet Explorer 7(IE7) »