Construction that renewed the floor in the living room (Integrated it with the kitchen) and the entrance hall was done this week. It came to be able to eat in the living room today though the crossing putting of the wall had not been done yet. The illuminator was incidentally renewed, and the fire alarm was set up in kitchen.
The following schedule the bathroom (especially, changing room) to be constructed.

|