The bathroom was constructed this week. First of all, the bathroom changed from tiled into the interior of the overall film-lined. It was not possible to step into a bath for two days under construction. Next, the drainage trench was set up, and, then, it came to be able to dehydrate under the washing machine put on the changing room (The dehydration hose had been dripped to the bathroom up to now and dehydrated).
The exterior finish work of the house started at the end of this week, and the work stand was assembled.
As for the reform construction that started on January 15, it is scheduled to be full and to complete it in February if going well (It is one month earlier than the schedule at first).